Morovis Sur WTP Compliance Improvements


This project benefits approximately 27,200 residents in the municipality of Morovis and Vega Alta

Start a Work With Us

Project Details


  • Started on: July 2013
  • Completed on: September 2015
  • Contract Worth: $ 5,083,224
  • Location: Morovis, Puerto Rico

Include, among other, installation of new in-line mixer to the influent pipe, relocation of the pre-chlorination point from the influent pipe to the superpulsator’s effluent pipe, optimization of the existing filtration units, installation of an ultraviolet disinfection system, replacement of the hatch covers of the distribution tank, installation of new chlorine injection pump system, improvements to the existing sludge treatment system, improvements to the existing electrical system and site safety improvements, all in accordance to the Construction Drawings and specifications prepared by the PRASA. This project benefits approximately 27,200 residents in the municipality of Morovis and Vega Alta.

Looking for the Best Engineering Solution for your Project?